The train is expected to use a newly built, separate electrified track and run frequently. In addition to Quebec City, Montreal and Toronto, it would serve Trois-Rivières, Laval, Ottawa and Peterborough.

Transport Canada initially estimated that the cost of a high-speed rail link between the two cities could be as high as $80 billion.

It’s expected to take four to five years to design the future high-speed line. Funds are to be allocated at the end of that time period, so it’s possible a future government could modify or cancel the project.

  • kowcop@aussie.zone
    link
    fedilink
    English
    arrow-up
    11
    ·
    4 days ago

    In Australia, wheeling out the ‘high speed rail’ proposal means there is an election coming up…