• Neuromancer@lemm.ee
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    4
    ·
    7 months ago

    I incorrectly assumed we had many factories running at smaller capacities. Turns out we shuttered those to save money.

    I get things like cruise missiles are done in large batches but just assumed 155mm had several lines.